             Headwater Tailwater         ----------- Gate Positions ------------
             Elevation Elevation  Disch   #1   #2   #3   #4   #5   #6   #7   #8
             (ft-msl)  (ft-msl)   (cfs)  (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft)
                               (I) see note
Water Conservation Area #1
Inflows
 G300:         15.48     15.33       0   0.00 0.00
 G301:         15.57     15.44       0   0.00 0.00 0.00
                                        Speed of Pumps S362,G251,G310 (RPM)
 S362:         10.97     15.58      19     0   1   0   0   0   0   0
 G251:          9.02     15.41       0  -NR--NR--NR--NR--NR-
 G310:          -NR-      -NR-       0     0   0   1   0   1   0
Inflows:     19      cfs
________________________________________________________________________________
Outflows
  S10D:        15.42     11.89       0   0.00 0.00 0.00 0.00
  S10C:        15.44     11.85       0   0.00 0.00 0.00 0.00
  S10A:        15.42     11.83       0   0.00 0.00 0.00 0.00
  Total S10 Discharge:               0
  G94A:        12.97     15.43       0   0.00 0.00
  S39:         15.44      7.14       0   0.00
  G338:                              0
  S5AS:        13.48     15.44       0
Outflows:      0     cfs
Net Structure Flows (Inflows - Outflows):     19    cfs
________________________________________________________________________________
Stage
  Site 1-7:    15.42       3 Station Average  =  15.34
  Site 1-8T:   15.40       (Site 1-7, 1-8T and 1-9)
  Site 1-8C:   15.52       2 Station Average  =  15.30
  Site 1-9:    15.20       (Site 1-9 and 1-8T for Temp. Deviation)
  L8:           -NR-
  BLW S5AW:     -NR-
  S5AW:        10.34
________________________________________________________________________________
Daily Precipitation Totals
                                 1-Day       3-Day       7-Day
                                 (inches)    (inches)    (inches)
  S5A Pump Station:                -NR-        0.00        0.00
  Site 1-7:                        -NR-        0.00        0.00
  Site 1-8T:                       -NR-        0.00        0.00
  Site 1-8C:(Bad Gage)             -NR-        0.00        0.00
  Site 1-9:                        -NR-        0.00        0.00
  S6 Pump Station:                 -NR-        0.00        0.00
  S10D: (Bad Gage)                 -NR-        0.00        0.00
  -----------------------------------------------------------------
        WCA-1 Average  (Gages)     -NR-        0.00        0.00
        (Site 1-8C and S10D not included)
  -----------------------------------------------------------------
  WCA1 Nexrad Basin Avg            -NR-        0.00        0.00
  -----------------------------------------------------------------
 
________________________________________________________________________________
WCA-1 Regulation Schedules
                                            Elevation   Regulation  Departure
                                           (ft-NGVD)   (ft-NGVD)     (feet)
  Site 1-8C                                   15.52       15.75      -0.23
  Average of Sites 1-7, 1-9, 1-8T             15.34       15.75      -0.41
  Zone A2 with Site 1-8C                      15.52       15.75      -0.23
  Zone A2 with Site 1-7, 1-9, 1-8T            15.34       15.75      -0.41
  Floor (Site 8C)                             15.52       14.00       1.52
  Floor (AVG Site 7,9,8T)                     15.34       14.00       1.34
 
  Regulation Zone Elevations              A2= 15.75   B= 15.75   C= 14.00
  Available storage:    38,640 acre-feet
 
 ------------------------------------------------------------------------------
 *    DATES     !    USE GAGE      !        CONDITIONS                        *
 * 1JAN - 30JUN ! 1-8C (Canal)     !    All                                   *
 * 1JUL - 31DEC ! 1-8C (Canal)     !    Except as noted below                 *
 *              ! Average of 1-7,  !    During rising stages when canal       *
 *              ! 1-8T, and 1-9    !    stage exceeds average.                *
 ------------------------------------------------------------------------------
 
                                       3Station   Diff  Site8C   Diff
WCA-1 Elevations      22 JUN 2025         15.34          15.52
   22JUN25  -1 Day  = 21 JUN 2025 @ 2400  15.30  -0.04   15.51  -0.01
   22JUN25  -2 Days = 20 JUN 2025 @ 2400  15.30  -0.04   15.53   0.01
   22JUN25  -3 Days = 19 JUN 2025 @ 2400  15.33  -0.01   15.58   0.06
   22JUN25  -4 Days = 18 JUN 2025 @ 2400  15.33  -0.01   15.59   0.07
   22JUN25  -5 Days = 17 JUN 2025 @ 2400  15.36   0.02   15.62   0.10
   22JUN25  -6 Days = 16 JUN 2025 @ 2400  15.40   0.06   15.67   0.15
   22JUN25  -7 Days = 15 JUN 2025 @ 2400  15.43   0.09   15.71   0.19
   22JUN25 -30 Days = 23 MAY 2025 @ 2400  15.44   0.10   15.62   0.10
 
  S5AE:        13.49     11.60           0.80 0.80
  S5A Pumps:   10.28     15.45    -NR-   -NR- -NR- -NR- -NR- -NR- -NR- (cfs)
 G302:         15.47     13.11           0.00 0.00
___________________________________________________________________________
___________________________________________________________________________
Water Conservation Area #2
  S6 Pumps:     9.86     14.05       0      0    0    0                (cfs)
 
  Average of Sites 1-9 and 1-8T               15.30
  7 Day Recession Rate (ft/wk)                 0.13
  (Note: Rainfall check not complete)
                                             ELEV      Diff
2Station Avg.         22 JUN 2025             15.30
   22JUN25  -1 Day  = 21 JUN 2025 @ 2400      15.27    -0.03
   22JUN25  -2 Days = 20 JUN 2025 @ 2400      15.29    -0.01
   22JUN25  -3 Days = 19 JUN 2025 @ 2400      15.31     0.01
   22JUN25  -4 Days = 18 JUN 2025 @ 2400      15.34     0.04
   22JUN25  -5 Days = 17 JUN 2025 @ 2400      15.37     0.07
   22JUN25  -6 Days = 16 JUN 2025 @ 2400      15.40     0.10
   22JUN25  -7 Days = 15 JUN 2025 @ 2400      15.43     0.13
   22JUN25 -30 Days = 23 MAY 2025 @ 2400      15.50     0.20
___________________________________________________________________________
 
(I) - Flows marked with "I" signify that this is an instantaneous flow
      computed from the single value reported for the day.
      Otherwise, flow is a daily average.
Report Generated 23 JUN 2025 @ 18:15